NET0.
FIVE-IP CONTROL-SURFACE REFERENCE DEMONSTRATOR

From Evidence to Physical Effect.

A reference testbed for verifiable consequential execution.

Five complementary control surfaces. One observable effect model. Normal execution, deliberate failure injection, and reviewable evidence.

TESTBED STATUS FIRST-LIVE VALIDATED Public demo controls remain simulation-oriented. Separately, the NET0-NODE/1 external-node path has completed its first live signed, task-scoped safe-software-effect round trip with a Jetson Orin NX. Physical actuation remains disabled.
LIVE DEMO

Can This Exact Effect Occur Now?

A digitally capable system may be able to produce an effect. NET0 tests whether the configured execution-relevant conditions remain sufficient for the exact candidate effect at the release boundary.

Effect IDDEMO_LOAD_01
Requested effectTurn LOAD_01 ON for exactly 10 seconds
Default stateOFF
Current modeSIMULATION
Candidate Effect
→
Execution-Relevant Conditions
→
Final Release Boundary
→
Effect / No Effect
→
Reviewable Evidence
CHALLENGE LAB

Do Not Just Watch It Pass. Make It Fail.

Each challenge changes one configured condition while keeping the rest of the demonstration explicit. The v0.1.1 package is simulation-only.

RUNS & EVIDENCE

Review the Run, Not Just the Result.

Every simulated challenge run produces a structured evidence package and SHA-256 manifest. The external-node validation track also records hash-bound task, result, marker and manifest evidence. These records are experimental demonstrator artefacts, not certificates or legal proof.

RUN_ID/
├── RUN_MANIFEST.json
├── ENVIRONMENT.json
├── EFFECT_REQUEST.json
├── evidence/
├── spip/
├── acavp/
├── pact/
├── tpol/
├── authorization/
├── execution/
├── recovery/
├── MANIFEST.sha256
└── SUMMARY.md
RunChallengeDecisionEffectCreated
No simulated challenge runs yet. External-node first-live validation: TASK-20261005T182909Z-A4912C4DCE8D · EXECUTED → COMPLETED · safe software effect · settled task=null · KVM8 manifest 0370b8ad448840126efed5bf89fa9edc320f05c9a3e3e9d5a1fa5d13ae6519e8 · Edge manifest 9051be6bfad7bbc2607936538083e3731864e624e2d320496f9912e7543f3193
ARCHITECTURE

Cloud-Visible. Effect-Boundary Local.

NET0.HK / KVM8UI · API · Run Registry · Evidence Mirror
↓
Edge Decision NodeJetson Orin NX — first live signed external-node round trip validated
↓
Independent VerifierJetson Orin Nano — planned integration
↓
Physical EndpointESP32-S3 → low-voltage effect sink — planned integration

Design intent: the public KVM8 service can request, observe and record demonstrations, but it should not become the sole physical root of trust for later hardware phases.

FIVE CONTROL SURFACES

Complementary Controls, Not a Universal Five-Stage Sequence.

01 · LIVE EVIDENCE

SPIP

Tests configured freshness, precision, ordering and integrity conditions for execution-relevant live evidence.

02 · AUTHENTICITY

ACAVP

Tests configured authenticity and current-validity conditions for the relied-upon endpoint, component or identity.

03 · PHYSICAL FEASIBILITY

PACT

Tests whether the candidate physical action remains within the configured model, tolerances and feasibility envelope.

04 · DETERMINISTIC POLICY

TPOL

Evaluates verified execution-relevant inputs under an explicit deterministic policy profile.

05 · EXECUTION BOUNDARY

S2F / EAO / VEU

Tests configured final release verification for the exact candidate effect before consequential execution.

These are non-confidential demonstrator summaries. They do not define patent scope.

HARDWARE TESTBED

Reference Nodes

Hostinger KVM8

Public interface, API, run registry and evidence mirror.

CURRENT FOUNDATION

Jetson Orin NX 16GB

Edge decision/orchestration node.

FIRST-LIVE VALIDATED

Jetson Orin Nano 8GB

Independent verification node.

INTEGRATION PLANNED

Orange Pi 5B

Cross-platform reproduction/challenge node.

INTEGRATION PLANNED

Raspberry Pi Zero 2 W

Constrained/intermittent-connectivity endpoint.

INTEGRATION PLANNED

ESP32-S3 / ESP32-C3

Primary physical endpoint and secondary challenge endpoint.

INTEGRATION PLANNED
RESEARCH & IP CONTEXT

Different Layers, Deliberately Separated.

EvidenceToEffect.org

End-to-end research into consequential claims and evidence-to-effect continuity.

ExecutionGovernance.org

Independent research architecture concerned with current effect authority, constraints, continuity and reviewability.

DrKu.io

Non-confidential technology/IP portfolio and commercialisation context.

Net0.hk

Applied experimental demonstrator and reference testbed.